SKUs 1,600Types 8MOQ from 10 pcsCert EN71 · ASTM · CPSIAPort FOB NingboReply within 12h

Shape Sorter Puzzles · shape sorter

Wooden Shape Matching Board Animal Dinosaur Jigsaw Puzzle Children Cognition

Wooden shape sorter for the under-three band — cut, printed and packed in our own workshop.

  • colour and shape in one object
  • a puzzle with no picture to copy
  • shape comparison in the hand
  • Export packing with your shipping marks
EN71 / ASTM F963 / CPSIA reportsLogo & packaging customisableFOB Ningbo / Shanghai

About this puzzle

This wooden shape sorter belongs to the Shape Sorter Puzzles range and is built for the under-three band. It is a board-and-piece puzzle with a shaped location for every piece.

The board is cut from plywood, sanded through three grits and sealed before the print goes on. Print is UV cured and checked for registration and colour against the approved sample before the run continues.

The commercial side is simple: MOQ 100 pcs, 45-day production. Customisation covers logo, colour, packaging and the printed manual, all from your artwork.

Customisation

Logo (printed or engraved), print colour to a Pantone or physical sample, packaging (colour box, kraft box, display carton, gift box), printed warnings, barcode and importer details. Customisation on an existing product does not need new tooling; a new shape does, and we quote that as a one-off line.

Compliance

Tested to EN71 (EU), ASTM F963 and CPSIA (US) as required for the destination market, with CE marking where applicable. Reports are supplied per model. Age grading and small-parts classification follow the band shown above.

FAQ

What is the MOQ?
MOQ is 100 pcs for stock. A custom print or box usually starts at 100–300 pieces.
How long is production?
About 45 days after sample approval, plus transit from Ningbo or Shanghai.
What age is this sorter for?
The band on the page reflects the piece size and the small-parts grade; four-shape boards usually start at 12–18 months.
Do you supply samples?
Yes. Stock samples are dispatched in 3–7 working days and the sample cost is credited against the production order.