SKUs 1,600Types 8MOQ from 10 pcsCert EN71 · ASTM · CPSIAPort FOB NingboReply within 12h

Peg, Knob & Chunky Puzzles · peg puzzle

UDEAS Toys Game Jigsaw Wooden Peg Puzzles for

Wooden peg puzzle for the under-three band — cut, printed and packed in our own workshop.

  • fine motor control from a single piece
  • a board that survives a nursery day
  • the first puzzle a child can finish alone
  • Export packing with your shipping marks
EN71 / ASTM F963 / CPSIA reportsLogo & packaging customisableFOB Ningbo / Shanghai

About this puzzle

This wooden peg puzzle belongs to the Peg, Knob & Chunky Puzzles range and is built for the under-three band. It is a board-and-piece puzzle with a shaped location for every piece.

Every piece is cut, sanded on both faces and checked for fit against the board before printing. Edges and corners are rounded by hand because a puzzle edge is held, not looked at.

Orders start at 26 pcs, with about 14 days in production. The product can carry your logo, your artwork and your box without a new die line.

Customisation

Logo (printed or engraved), print colour to a Pantone or physical sample, packaging (colour box, kraft box, display carton, gift box), printed warnings, barcode and importer details. Customisation on an existing product does not need new tooling; a new shape does, and we quote that as a one-off line.

Compliance

Tested to EN71 (EU), ASTM F963 and CPSIA (US) as required for the destination market, with CE marking where applicable. Reports are supplied per model. Age grading and small-parts classification follow the band shown above.

FAQ

What is the MOQ?
MOQ is 26 pcs for stock. A custom print or box usually starts at 100–300 pieces.
How long is production?
About 14 days after sample approval, plus transit from Ningbo or Shanghai.
What is the difference between peg and knob?
The handle size: a peg is a small cylinder, a knob is a larger round grip for younger hands. This product is the format stated on the page.
Do you supply samples?
Yes. Stock samples are dispatched in 3–7 working days and the sample cost is credited against the production order.