SKUs 1,600Types 8MOQ from 10 pcsCert EN71 · ASTM · CPSIAPort FOB NingboReply within 12h

Number & Counting Puzzles · number puzzle

10 Rings Hanoi Tower in Wood Box Rainbow Stacking Math Puzzle Toy Wooden Tower of Hanoi

Wooden number puzzle for children aged one to three — cut, printed and packed in our own workshop.

  • early maths without a worksheet
  • numeral recognition through touch
  • counting that can be checked
  • Export packing with your shipping marks
EN71 / ASTM F963 / CPSIA reportsLogo & packaging customisableFOB Ningbo / Shanghai

About this puzzle

This wooden number puzzle belongs to the Number & Counting Puzzles range and is built for children aged one to three. It is a board-and-piece puzzle with a shaped location for every piece.

It is produced on the same line as the rest of the numbers range: cut, sand, decorate, check, pack. Colour is matched against the approved sample, not against a screen.

Orders start at 1 pcs, with about 25 days in production. Customisation covers logo, colour, packaging and the printed manual, all from your artwork.

Customisation

Logo (printed or engraved), print colour to a Pantone or physical sample, packaging (colour box, kraft box, display carton, gift box), printed warnings, barcode and importer details. Customisation on an existing product does not need new tooling; a new shape does, and we quote that as a one-off line.

Compliance

Tested to EN71 (EU), ASTM F963 and CPSIA (US) as required for the destination market, with CE marking where applicable. Reports are supplied per model. Age grading and small-parts classification follow the band shown above.

FAQ

What is the MOQ?
MOQ is 1 pcs for stock. A custom print or box usually starts at 100–300 pieces.
How long is production?
About 25 days after sample approval, plus transit from Ningbo or Shanghai.
Is the numeral style standard?
Numerals are printed in a rounded single-storey style to match early-years handwriting; a specific scheme can be printed to order.
Do you supply samples?
Yes. Stock samples are dispatched in 3–7 working days and the sample cost is credited against the production order.