SKUs 1,600Types 8MOQ from 10 pcsCert EN71 · ASTM · CPSIAPort FOB NingboReply within 12h

Matching & Memory Puzzles · matching puzzle

Products Wood Animal Matching Puzzle Game 3D Wooden Jigsaw for CE

Wooden matching puzzle for the preschool band — cut, printed and packed in our own workshop.

  • a self-correcting format
  • the quietest puzzle on the shelf
  • pair and shadow recognition
  • Export packing with your shipping marks
EN71 / ASTM F963 / CPSIA reportsLogo & packaging customisableFOB Ningbo / Shanghai

About this puzzle

This wooden matching puzzle belongs to the Matching & Memory Puzzles range and is built for the preschool band. It is a pair-and-match format rather than a single picture.

Cutting is laser for shaped pieces and die-cut for volume boards; both are hand-sanded before decoration. The finish is checked under raking light; a defect that is invisible on a shelf shows up in a child's hand.

It is quoted at MOQ 2 pcs, with production around 20 days. Logo, print colour, box and barcode can be changed on a production order; none of that needs new tooling.

Customisation

Logo (printed or engraved), print colour to a Pantone or physical sample, packaging (colour box, kraft box, display carton, gift box), printed warnings, barcode and importer details. Customisation on an existing product does not need new tooling; a new shape does, and we quote that as a one-off line.

Compliance

Tested to EN71 (EU), ASTM F963 and CPSIA (US) as required for the destination market, with CE marking where applicable. Reports are supplied per model. Age grading and small-parts classification follow the band shown above.

FAQ

What is the MOQ?
MOQ is 2 pcs for stock. A custom print or box usually starts at 100–300 pieces.
How long is production?
About 20 days after sample approval, plus transit from Ningbo or Shanghai.
Is the matching self-correcting?
The two-piece sets are cut so only the right pair fits; board formats rely on the picture.
Do you supply samples?
Yes. Stock samples are dispatched in 3–7 working days and the sample cost is credited against the production order.