SKUs 1,600Types 8MOQ from 10 pcsCert EN71 · ASTM · CPSIAPort FOB NingboReply within 12h

Matching & Memory Puzzles · matching puzzle

Children 3D Jigsaw Puzzle Board Game Wooden Matching Toys for

Wooden matching puzzle for the preschool band — cut, printed and packed in our own workshop.

  • the quietest puzzle on the shelf
  • pair and shadow recognition
  • turn-taking in a group game
  • Export packing with your shipping marks
EN71 / ASTM F963 / CPSIA reportsLogo & packaging customisableFOB Ningbo / Shanghai

About this puzzle

This wooden matching puzzle belongs to the Matching & Memory Puzzles range and is built for the preschool band. It is a pair-and-match format rather than a single picture.

Every piece is cut, sanded on both faces and checked for fit against the board before printing. Print is UV cured and checked for registration and colour against the approved sample before the run continues.

The commercial side is simple: MOQ 500 pcs, 7-day production. Customisation covers logo, colour, packaging and the printed manual, all from your artwork.

Customisation

Logo (printed or engraved), print colour to a Pantone or physical sample, packaging (colour box, kraft box, display carton, gift box), printed warnings, barcode and importer details. Customisation on an existing product does not need new tooling; a new shape does, and we quote that as a one-off line.

Compliance

Tested to EN71 (EU), ASTM F963 and CPSIA (US) as required for the destination market, with CE marking where applicable. Reports are supplied per model. Age grading and small-parts classification follow the band shown above.

FAQ

What is the MOQ?
MOQ is 500 pcs for stock. A custom print or box usually starts at 100–300 pieces.
How long is production?
About 7 days after sample approval, plus transit from Ningbo or Shanghai.
Is the matching self-correcting?
The two-piece sets are cut so only the right pair fits; board formats rely on the picture.
Do you supply samples?
Yes. Stock samples are dispatched in 3–7 working days and the sample cost is credited against the production order.