SKUs 1,600Types 8MOQ from 10 pcsCert EN71 · ASTM · CPSIAPort FOB NingboReply within 12h

Alphabet & Letter Puzzles · alphabet puzzle

Fq Brand Alphabet Wooden Puzzle Jigsaw 3d

Wooden alphabet puzzle for the 3–5 age group — cut, printed and packed in our own workshop.

  • the link between a sound and a shape
  • letter shapes handled, not just seen
  • letter recognition that sticks
  • Export packing with your shipping marks
EN71 / ASTM F963 / CPSIA reportsLogo & packaging customisableFOB Ningbo / Shanghai

About this puzzle

This wooden alphabet puzzle belongs to the Alphabet & Letter Puzzles range and is built for the 3–5 age group. It is a board-and-piece puzzle with a shaped location for every piece.

Cutting is laser for shaped pieces and die-cut for volume boards; both are hand-sanded before decoration. Every batch is pull-tested on the knobs or pegs where the format has them.

The commercial side is simple: MOQ 100 pcs, 31-day production. Logo, print colour, box and barcode can be changed on a production order; none of that needs new tooling.

Customisation

Logo (printed or engraved), print colour to a Pantone or physical sample, packaging (colour box, kraft box, display carton, gift box), printed warnings, barcode and importer details. Customisation on an existing product does not need new tooling; a new shape does, and we quote that as a one-off line.

Compliance

Tested to EN71 (EU), ASTM F963 and CPSIA (US) as required for the destination market, with CE marking where applicable. Reports are supplied per model. Age grading and small-parts classification follow the band shown above.

FAQ

What is the MOQ?
MOQ is 100 pcs for stock. A custom print or box usually starts at 100–300 pieces.
How long is production?
About 31 days after sample approval, plus transit from Ningbo or Shanghai.
Uppercase or lowercase?
The set follows the form stated in the product title. Mixed and bilingual sets are available to order.
Do you supply samples?
Yes. Stock samples are dispatched in 3–7 working days and the sample cost is credited against the production order.