SKUs 1,600Types 8MOQ from 10 pcsCert EN71 · ASTM · CPSIAPort FOB NingboReply within 12h

Process

From artwork to container

Seven steps, and the buyer only has to act at three of them.

The seven steps

1. Brief and quote. 2. Sample or stock sample. 3. Artwork and die line approval. 4. Bulk production. 5. In-line QC. 6. Final inspection and packing. 7. Loading at Ningbo or Shanghai.

Where the buyer acts

At the brief (product, quantity, market, packaging), at sample approval, and at artwork approval. After that the timeline is ours; the buyer receives a QC report and loading photos before the container leaves.